3 thoughts on “How long is the construction cycle designed by the digital exhibition hall?”

  1. According to some previous work experience in the digital exhibition hall, the overall design and construction cycle of the exhibition hall with less than 1,000 square meters is usually within 2 months. Finish. If the exhibition hall with an area of ​​more than 1,000 square meters must take 3 months or even longer to complete. The larger the area, the longer it takes. In addition, the project budget must be referred to. During the construction of a large number of manpower to the exhibition hall, the time cycle can be shortened.

  2. 1. During the communication requirements stage
    The first step of a exhibition hall project is to communicate and communicate according to the intentions of Party A, to obtain Party A's needs as accurate and complete as possible, and conduct preliminary explorations on the project site for size. Measurement and drawing drawing.
    2. Plan the concept plan according to the needs
    According to the needs of Party A, the planner needs to browse and collect a large amount of various available materials, refine the theme of the content of the content and the needs of Party A, and then set the exhibition around the theme. Chen Jian.
    3. The preliminary spatial design plan was led by the curatorial concept case
    . After the concept case was determined, the planner needs to explain the plan to the design team to assist the design team to quickly understand and digestive solutions, and discuss deepening design. Later, the space designer issued a flat partition plan and designed the renderings according to the content of the plan.
    4. Preparation of budgets and participating in bidding
    Is when the design plan has been determined, the construction drawing and budget list should be prepared according to the design effect, and the bid response documents are formed according to the bidding procedure proposed by Party A. Time bids.
    5. Deepening plan, enter the construction
    Is when Party A reaches cooperation with the design party, it is necessary to communicate with Party A to confirm the final plan, make small -scale modification and adjustment according to the budget and needs, and further deepen the scheme. When the two sides reach an agreement, the construction team can be arranged to enter the construction. The construction session belongs to the later stage of the project. During the basic decoration and exhibition of the site, it can adjust the details of the text content with Party A and complete the layout and text compilation of all the contents of the wall.
    6. Software production
    Software production is also a post -work. Usually, after determining the theme plan, the relevant producers will collect data and communicate the needs of the plan to present the digital content in the plan. The production of all digital content in the exhibition hall.
    7, hardware software installation and commissioning
    It software content after the production is completed, the software and hardware installation and commissioning stage is completed. This stage has a long period of cycle and many uncontrollable factors. It often takes a lot of time. Debug the program, control the time progress.
    8. Completion acceptance, later warranty
    The party A and supervision units accepts the project. If there are some problems and flaws, it can be further adjusted and corrected. The construction unit is responsible for the exhibition during the contracting period After -sales protection service.

  3. The smart exhibition hall design has been loved and praised by many customers because of its strong modernity and shocking display effect. The design of the smart exhibition hall is very high -tech exhibition items, which can trigger the interest of visitors, and then have a richer understanding and sense of the content of the exhibition hall, and then promote the transaction of customers. Nowadays, there are more and more customers who want to be a technology exhibition hall. One of the questions that are more concerned are how long it takes to do the science and technology exhibition hall. The longer the time, and each exhibition hall has all requirements for construction. Therefore, we must not be strictly strictly done in accordance with the specified production process, so that it can be accepted by engineering. According to some previous project experience, the overall design of the exhibition hall with less than 1,000 square meters in the case is within 2 months. Do it within a month. If the exhibition hall with a total area of ​​more than 1,000 square meters takes 3 months or even longer, it can be completed. The larger the total area is Being able to invest more artificially in the exhibition hall construction, then the time cycle can be shortened.

Shopping Cart